Photon Energy announces a ninefold increase and 100% success rate in building and connecting photovoltaic plants in 2010
29-12-2010
The Management Board of Photon Energy announces that after the announcements on 29 December 2010 the company achieved a 100% success rate in building, connecting and securing the 2010 feed-in-tariff for all client and portfolio projects.
In 2010 Photon Energy in total built and connected
• client plants with an installed capacity of 12.509 MWp in the Czech Republic, and
• a client plant with an installed capacity of 300 KWp in Slovakia, and
• a proprietary portfolio of 14.985 MWp in the Czech Republic, and
• a proprietary portfolio of 4.696 MWp in Slovakia (pro-rata 3.067 MWp).
Photon Energy completed photovoltaic plants with a total installed capacity of 32.49 MWp in 2010, representing almost a ninefold increase in completed installed capacity compared to the 3.637 MWp connected in 2009.
Legal basis: Article 3, Section 1, of Exhibit 3 of the Alternative Trading System Rules, as adopted by Resolution Nr. 147/2007, dated 1 March 2007, and amended by Resolution No. 733/2009, dated 18 December 2009, of the Warsaw Stock Exchange Management Board
In 2010 Photon Energy in total built and connected
• client plants with an installed capacity of 12.509 MWp in the Czech Republic, and
• a client plant with an installed capacity of 300 KWp in Slovakia, and
• a proprietary portfolio of 14.985 MWp in the Czech Republic, and
• a proprietary portfolio of 4.696 MWp in Slovakia (pro-rata 3.067 MWp).
Photon Energy completed photovoltaic plants with a total installed capacity of 32.49 MWp in 2010, representing almost a ninefold increase in completed installed capacity compared to the 3.637 MWp connected in 2009.
Legal basis: Article 3, Section 1, of Exhibit 3 of the Alternative Trading System Rules, as adopted by Resolution Nr. 147/2007, dated 1 March 2007, and amended by Resolution No. 733/2009, dated 18 December 2009, of the Warsaw Stock Exchange Management Board